greenenergyfutures.ca website information.
greenenergyfutures.ca domain name is registered by .CA top-level domain registry. See the other sites registred in .CA domain zone.
No name server records were found.
and probably website greenenergyfutures.ca is hosted by ASN-CC - Constant Contact, Inc, US web hosting company. Check the complete list of other most popular websites hosted by ASN-CC - Constant Contact, Inc, US hosting company.
According to Alexa traffic rank the highest website greenenergyfutures.ca position was 160076 (in the world). The lowest Alexa rank position was 999984. Now website greenenergyfutures.ca ranked in Alexa database as number 882396 (in the world).
Website greenenergyfutures.ca Desktop speed measurement score (15/100) is better than the results of 2.65% of other sites shows that the page desktop performance can be improved.
greenenergyfutures.ca Mobile usability score (99/100) is better than the results of 79.46% of other sites and means that the page is mobile-friendly.
Mobile speed measurement score of greenenergyfutures.ca (8/100) is better than the results of 1.13% of other sites and shows that the landing page performance on mobile devices is poor and can be improved.
Weekly Rank Report
Date | Rank | Change |
---|---|---|
Nov-20-2024 | N/A | N/A |
Nov-19-2024 | 882,396 | 1,057 |
Nov-18-2024 | 883,453 | -6,834 |
Nov-17-2024 | 876,619 | 34,866 |
Nov-16-2024 | 911,485 | 1,189 |
Nov-15-2024 | 912,674 | -20,479 |
Nov-14-2024 | 892,195 | -5,031 |
Advertisement
greenenergyfutures.ca Rank History
Alexa can identify the popularity of a website as well as its competitors. It is important for website owners and bloggers to know their Alexa ranking because it shows how many visitors have viewed their web page. It gives them a clear idea of how popular their website is on the internet and the ranking of their competitors.
greenenergyfutures.ca whois
WHOIS is a query and response protocol that is widely used for querying databases that store the registered users or assignees of an Internet resource, such as a domain name, an IP address block, or an autonomous system, but is also used for a wider range of other information.
Domain Name: greenenergyfutures.ca
Registry Domain ID: 374952-CIRA
Registrar WHOIS Server: whois.ca.fury.ca
Registrar URL: www.netfirms.ca
Updated Date: 2021-10-28T18:34:46Z
Creation Date: 2010-11-17T17:30:30Z
Registry Expiry Date: 2023-11-17T17:30:30Z
Registrar: Netfirms, LTD
Registrar IANA ID: not applicable
Registrar Abuse Contact Email: cira@endurance.com
Registrar Abuse Contact Phone: +1.9024068539
Domain Status: clientTransferProhibited https://icann.org/epp#clientTransferProhibited
Domain Status: clientUpdateProhibited https://icann.org/epp#clientUpdateProhibited
Registry Registrant ID: REDACTED FOR PRIVACY
Registrant Name: REDACTED FOR PRIVACY
Registrant Organization: REDACTED FOR PRIVACY
Registrant Street: REDACTED FOR PRIVACY
Registrant City: REDACTED FOR PRIVACY
Registrant State/Province: REDACTED FOR PRIVACY
Registrant Postal Code: REDACTED FOR PRIVACY
Registrant Country: REDACTED FOR PRIVACY
Registrant Phone: REDACTED FOR PRIVACY
Registrant Phone Ext: REDACTED FOR PRIVACY
Registrant Fax: REDACTED FOR PRIVACY
Registrant Fax Ext: REDACTED FOR PRIVACY
Registrant Email: Please ask the Registrar of Record identified in this output for information on how to contact the Registrant, Admin, or Other contacts of the queried domain name
Registry Admin ID: REDACTED FOR PRIVACY
Admin Name: REDACTED FOR PRIVACY
Admin Organization: REDACTED FOR PRIVACY
Admin Street: REDACTED FOR PRIVACY
Admin City: REDACTED FOR PRIVACY
Admin State/Province: REDACTED FOR PRIVACY
Admin Postal Code: REDACTED FOR PRIVACY
Admin Country: REDACTED FOR PRIVACY
Admin Phone: REDACTED FOR PRIVACY
Admin Phone Ext: REDACTED FOR PRIVACY
Admin Fax: REDACTED FOR PRIVACY
Admin Fax Ext: REDACTED FOR PRIVACY
Admin Email: Please ask the Registrar of Record identified in this output for information on how to contact the Registrant, Admin, or Other contacts of the queried domain name
Registry Tech ID: REDACTED FOR PRIVACY
Tech Name: REDACTED FOR PRIVACY
Tech Organization: REDACTED FOR PRIVACY
Tech Street: REDACTED FOR PRIVACY
Tech City: REDACTED FOR PRIVACY
Tech State/Province: REDACTED FOR PRIVACY
Tech Postal Code: REDACTED FOR PRIVACY
Tech Country: REDACTED FOR PRIVACY
Tech Phone: REDACTED FOR PRIVACY
Tech Phone Ext: REDACTED FOR PRIVACY
Tech Fax: REDACTED FOR PRIVACY
Tech Fax Ext: REDACTED FOR PRIVACY
Tech Email: Please ask the Registrar of Record identified in this output for information on how to contact the Registrant, Admin, or Other contacts of the queried domain name
Registry Billing ID: REDACTED FOR PRIVACY
Billing Name: REDACTED FOR PRIVACY
Billing Organization: REDACTED FOR PRIVACY
Billing Street: REDACTED FOR PRIVACY
Billing City: REDACTED FOR PRIVACY
Billing State/Province: REDACTED FOR PRIVACY
Billing Postal Code: REDACTED FOR PRIVACY
Billing Country: REDACTED FOR PRIVACY
Billing Phone: REDACTED FOR PRIVACY
Billing Phone Ext: REDACTED FOR PRIVACY
Billing Fax: REDACTED FOR PRIVACY
Billing Fax Ext: REDACTED FOR PRIVACY
Billing Email: Please ask the Registrar of Record identified in this output for information on how to contact the Registrant, Admin, or Other contacts of the queried domain name
Name Server: ns1.netfirms.com
Name Server: ns2.netfirms.com
DNSSEC: unsigned
URL of the ICANN Whois Inaccuracy Complaint Form: https://www.icann.org/wicf/
>>> Last update of WHOIS database: 2022-04-11T21:56:45Z
greenenergyfutures.ca server information
Servers Location
IP Address |
---|
Country |
---|
greenenergyfutures.ca desktop page speed rank
Last tested: 2019-11-11
greenenergyfutures.ca Desktop Speed Test Quick Summary
priority - 145 Optimize images
Properly formatting and compressing images can save many bytes of data.
Optimize the following images to reduce their size by 1.4MiB (96% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/themes…/images/GEF-header.jpg could save 31.7KiB (52% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/upload…-powerwall-150x150.jpg could save 484B (21% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/upload…-RE-Myths1-150x150.jpg could save 453B (16% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/upload…-Turbines2-150x150.jpg could save 442B (20% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/upload…ind-Myths1-150x150.jpg could save 413B (14% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/upload…5/SK-Wind1-150x150.jpg could save 383B (11% reduction).
priority - 115 Leverage browser caching
Setting an expiry date or a maximum age in the HTTP headers for static resources instructs the browser to load previously downloaded resources from local disk rather than over the network.
Leverage browser caching for the following cacheable resources:
http://pagead2.googlesyndication.com/pagead/js/adsbygoogle.js (60 minutes)
http://www.google-analytics.com/analytics.js (2 hours)
http://www.greenenergyfutures.ca/wp-content/plugin…ets/js/frontend.min.js (4 hours)
http://www.greenenergyfutures.ca/wp-content/plugin…lock-library/style.css (4 hours)
http://www.greenenergyfutures.ca/wp-content/plugins/jetpack/css/jetpack.css (4 hours)
http://www.greenenergyfutures.ca/wp-content/plugin…sets/css/style.min.css (4 hours)
http://www.greenenergyfutures.ca/wp-content/plugin…blocks.style.build.css (4 hours)
http://www.greenenergyfutures.ca/wp-content/plugin…/css/rss-retriever.css (4 hours)
http://www.greenenergyfutures.ca/wp-content/themes…/library/css/style.css (4 hours)
http://www.greenenergyfutures.ca/wp-content/themes…/images/GEF-header.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/themes…odernizr.custom.min.js (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ls-Story-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ian-Solar4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…p-Alberta1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…werplants4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…olar-West1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ke-City1-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…repeneurs1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…g-Biomass1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…fr-Biogas1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…fr-Biogas2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Building3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Biodiesal3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…struction1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…rgy-Waste3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…on-Planes1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…05/Car2Go1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…rtation1-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-as-Green1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Storage1-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…gan-Solar1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…lean-Tech1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…evolution2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…rth-Tubes1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ist-2013-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…y-Storage1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…onference3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…/01/CCEMC1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…hases-Out2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ric-Bikes1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Phase-Out1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ond-Solar1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ive-Solar1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ban-Cogen2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…est-Power1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…way-homes1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ermal-YEG1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…/04/GLOBE3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Biofuels1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…reenhouse1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…us-E-Bike1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…d-Ethanol1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…5/Kidwind1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…y2-768x663-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Evolution1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Townhomes1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Earthship1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…/Ecohaven1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…lar-M-Hat1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Landmark1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…lar-Stock1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ift-Guide3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Solar-FIT3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Literacy-3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ic-Centre4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ficiency-2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…bourhoods1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ner-Cabin1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-powerwall-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…I-Toronto2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…i-C-Train1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ild-Plant2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ine-Solar3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ransition1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ity-Solar3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Training4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…015-pt1-4--150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…reen-Jobs1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…t-of-20151-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ation-1011-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Biogas1-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ive-House8-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…E-Finance4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…sclimate01-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…5/AEEA-EE4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Turbines2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ass-ALPAC2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…hitecourt1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…s-Ethanol2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…24502196_o-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…lgary-CT-6-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…olar-West2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…age-Suite1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…nability-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…d-Storage2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…to-Cradle2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…coVillage4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Revisited1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…rmal-201-3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-RE-Myths1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…res-Solar1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…fficiency3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…and-Earth1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…berley-EE2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…EED-Rocks3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…tario-GEA2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ocks-Wind4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…PEI-WECan1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…EV-Update1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…5/SK-Wind1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ina-Creek2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…rt-Meters1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…r-Heating2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…r-Hot-Air1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…lar-Myths1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Education3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…n-Biochar3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Gregor-R.2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…a-Gasteiz4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ind-Myths1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…r-Cycling2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-of-2012-3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…omass-SP-2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…rog-Power4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ed-Energy1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Net-Zero3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…rtation2-2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…en-School2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…reenhouse1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ome-Audit2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-House-NZ2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…dfill-Gas2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…6/NZ-101-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…hermostat2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ity-Power1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ket-Stove2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Whistlers1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…lse-Creek2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…nty-Solar1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…merside2-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…avey-Mart1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…va-Scotia1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…St.-Anne-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…6/Walmart4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…to-Willow4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Wind-Farm1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…duc-Solar1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…SES-solar3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ite-paper5-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…53748602_o-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…38139024_o-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…f4341477_k-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…10/MG_7900-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…39645186_o-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…d-of-Coal2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ansition11-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…22472466_o-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…r-original-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…gieSprong1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-the-Woods-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…30440421_o-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…94932505_o-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…44146541_o-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…82566631_o-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…17/04/EV02-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Net-Zero01-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…u-Solar-02-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…5/IMG_2487-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ll1cropped-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ro-Label06-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ped-square-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…iciency-02-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…8/Eagles-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…quare-crop-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…7/09/C4001-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…quare-3000-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…quare-3000-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Kube-smile-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ar-on-roof-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ev2-SQUARE-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…erGuide-02-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…hurch-12-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ergy-chart-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ring-Ridge-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…horizontal-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…mbiosis-11-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ses2good-3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…olar-inset-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Townhomes-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ons-Hope-6-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…E-extras-5-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ts-Manager-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…lBourdier4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…olarShare1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…h-shovel-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…enhanced-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…en-at-AEEA-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Wind-Farm-CROPPED.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ie-on-roof-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-unit-WIDE-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-students-150x150.jpeg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Version-2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ab-behind-150x150.jpeg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ll-Creek-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…f-Canada-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…sive-House-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ftop-solar-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…red-Simons-150x150.png (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…7B7AEE7DC-150x150.jpeg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ture-Image-150x150.png (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…el-machine-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Wallraven-150x150.png (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…UARE-IMAGE-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…nks-main-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…rek-Leahy4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…th-office1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…g-in-field-150x150.png (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…aic-Centre-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Tesla-Blue-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Chevy-Bolt-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-on-roof-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…an-Leaf-20-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…l-X-square-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…t-3-square-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…iel-LowRes-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Recycling-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…e_Marching-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…wn-Centre-200x200.jpeg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…over-Photo-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Rossi-Loop-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ight_final-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-includes/js/jq…/jquery-migrate.min.js (4 hours)
http://www.greenenergyfutures.ca/wp-includes/js/jquery/jquery.js (4 hours)
http://www.greenenergyfutures.ca/wp-includes/js/wp-emoji-release.min.js (4 hours)
priority - 106 Enable compression
Compressing resources with gzip or deflate can reduce the number of bytes sent over the network.
Enable compression for the following resources to reduce their transfer size by 1MiB (84% reduction).
Compressing http://www.greenenergyfutures.ca/wp-includes/js/jquery/jquery.js could save 61.6KiB (65% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/plugins/jetpack/css/jetpack.css could save 57.7KiB (82% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/plugin…sets/css/style.min.css could save 41.3KiB (86% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/plugin…lock-library/style.css could save 38.3KiB (85% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/themes…/library/css/style.css could save 20.1KiB (72% reduction).
Compressing http://www.greenenergyfutures.ca/wp-includes/js/wp-emoji-release.min.js could save 9KiB (66% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/themes…odernizr.custom.min.js could save 8.7KiB (58% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/plugin…ets/js/frontend.min.js could save 6.4KiB (70% reduction).
Compressing http://www.greenenergyfutures.ca/wp-includes/js/jq…/jquery-migrate.min.js could save 5.9KiB (60% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/plugin…blocks.style.build.css could save 1.4KiB (67% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/plugin…/css/rss-retriever.css could save 931B (64% reduction).
priority - 40 Reduce server response time
In our test, your server responded in 2.1 seconds.
There are many factors that can slow down your server response time. Please read our recommendations to learn how you can monitor and measure where your server is spending the most time.
priority - 15 Minify HTML
Compacting HTML code, including any inline JavaScript and CSS contained in it, can save many bytes of data and speed up download and parse times.
Minify HTML for the following resources to reduce their size by 151.3KiB (17% reduction).
priority - 8 Eliminate render-blocking JavaScript and CSS in above-the-fold content
Your page has 4 blocking script resources and 8 blocking CSS resources. This causes a delay in rendering your page.
None of the above-the-fold content on your page could be rendered without waiting for the following resources to load. Try to defer or asynchronously load blocking resources, or inline the critical portions of those resources directly in the HTML.
Remove render-blocking JavaScript:
http://www.greenenergyfutures.ca/wp-includes/js/jquery/jquery.js
http://www.greenenergyfutures.ca/wp-includes/js/jq…/jquery-migrate.min.js
http://www.greenenergyfutures.ca/wp-content/themes…odernizr.custom.min.js
Optimize CSS Delivery of the following:
http://www.greenenergyfutures.ca/wp-content/plugin…lock-library/style.css
http://maxcdn.bootstrapcdn.com/font-awesome/4.7.0/css/font-awesome.min.css
http://www.greenenergyfutures.ca/wp-content/plugin…/css/rss-retriever.css
http://www.greenenergyfutures.ca/wp-content/plugin…sets/css/style.min.css
http://www.greenenergyfutures.ca/wp-content/themes…/library/css/style.css
http://www.greenenergyfutures.ca/wp-content/plugins/jetpack/css/jetpack.css
http://cdn-images.mailchimp.com/embedcode/classic-081711.css
priority - 0 Minify CSS
Compacting CSS code can save many bytes of data and speed up download and parse times.
Minify CSS for the following resources to reduce their size by 358B (14% reduction).
Minifying http://cdn-images.mailchimp.com/embedcode/classic-081711.css could save 140B (13% reduction) after compression.
greenenergyfutures.ca Desktop Resources
Total Resources | 238 |
Number of Hosts | 6 |
Static Resources | 236 |
JavaScript Resources | 7 |
CSS Resources | 8 |
greenenergyfutures.ca Desktop Resource Breakdown
greenenergyfutures.ca mobile page speed rank
Last tested: 2019-10-14
greenenergyfutures.ca Mobile Speed Test Quick Summary
priority - 172 Leverage browser caching
Setting an expiry date or a maximum age in the HTTP headers for static resources instructs the browser to load previously downloaded resources from local disk rather than over the network.
Leverage browser caching for the following cacheable resources:
http://pagead2.googlesyndication.com/pagead/js/adsbygoogle.js (60 minutes)
http://www.google-analytics.com/analytics.js (2 hours)
http://www.greenenergyfutures.ca/wp-content/plugin…ets/js/frontend.min.js (4 hours)
http://www.greenenergyfutures.ca/wp-content/plugins/jetpack/css/jetpack.css (4 hours)
http://www.greenenergyfutures.ca/wp-content/plugin…sets/css/style.min.css (4 hours)
http://www.greenenergyfutures.ca/wp-content/plugin…blocks.style.build.css (4 hours)
http://www.greenenergyfutures.ca/wp-content/plugin…/css/rss-retriever.css (4 hours)
http://www.greenenergyfutures.ca/wp-content/themes…/library/css/style.css (4 hours)
http://www.greenenergyfutures.ca/wp-content/themes…/images/GEF-header.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/themes…odernizr.custom.min.js (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ls-Story-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ian-Solar4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…p-Alberta1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…werplants4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…olar-West1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ke-City1-1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…repeneurs1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…g-Biomass1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…fr-Biogas1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…fr-Biogas2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Building3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Biodiesal3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…struction1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…rgy-Waste3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…on-Planes1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…05/Car2Go1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…rtation1-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-as-Green1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Storage1-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…gan-Solar1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…lean-Tech1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…evolution2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…rth-Tubes1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ist-2013-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…y-Storage1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…onference3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…/01/CCEMC1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…hases-Out2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ric-Bikes1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Phase-Out1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ond-Solar1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ive-Solar1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ban-Cogen2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…est-Power1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…way-homes1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ermal-YEG1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…/04/GLOBE3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Biofuels1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…reenhouse1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…us-E-Bike1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…d-Ethanol1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…5/Kidwind1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…y2-768x663-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Evolution1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Townhomes1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Earthship1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…/Ecohaven1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…lar-M-Hat1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Landmark1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…lar-Stock1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ift-Guide3-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Solar-FIT3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Literacy-3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ic-Centre4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ficiency-2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…bourhoods1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ner-Cabin1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-powerwall-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…I-Toronto2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…i-C-Train1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ild-Plant2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ine-Solar3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ransition1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ity-Solar3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Training4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…015-pt1-4--150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…reen-Jobs1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…t-of-20151-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ation-1011-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Biogas1-1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ive-House8-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…E-Finance4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…sclimate01-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…5/AEEA-EE4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Turbines2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ass-ALPAC2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…hitecourt1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…s-Ethanol2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…24502196_o-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…lgary-CT-6-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…olar-West2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…age-Suite1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…nability-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…d-Storage2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…to-Cradle2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…coVillage4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Revisited1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…rmal-201-3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-RE-Myths1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…res-Solar1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…fficiency3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…and-Earth1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…berley-EE2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…EED-Rocks3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…tario-GEA2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ocks-Wind4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…PEI-WECan1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…EV-Update1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…5/SK-Wind1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ina-Creek2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…rt-Meters1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…r-Heating2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…r-Hot-Air1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…lar-Myths1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Education3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…n-Biochar3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Gregor-R.2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…a-Gasteiz4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ind-Myths1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…r-Cycling2-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-of-2012-3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…nd-in-BC-5-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…omass-SP-2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…rog-Power4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ed-Energy1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Net-Zero3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…rtation2-2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…en-School2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…reenhouse1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ome-Audit2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-House-NZ2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…dfill-Gas2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…6/NZ-101-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…hermostat2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ity-Power1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…rs-Story-3-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ket-Stove2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Whistlers1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…lse-Creek2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ar-Share-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…nty-Solar1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…merside2-1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…avey-Mart1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…va-Scotia1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…St.-Anne-1-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…6/Walmart4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…to-Willow4-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Wind-Farm1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…duc-Solar1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…SES-solar3-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ite-paper5-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…53748602_o-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…38139024_o-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…f4341477_k-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…10/MG_7900-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…39645186_o-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…d-of-Coal2-150x150.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ansition11-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…22472466_o-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…r-original-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…gieSprong1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-the-Woods-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…30440421_o-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…94932505_o-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…44146541_o-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…82566631_o-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…17/04/EV02-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Net-Zero01-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…u-Solar-02-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…5/IMG_2487-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ll1cropped-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ro-Label06-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ped-square-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…iciency-02-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…8/Eagles-1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…quare-crop-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…7/09/C4001-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…quare-3000-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…quare-3000-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Kube-smile-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ar-on-roof-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ev2-SQUARE-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…erGuide-02-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…hurch-12-1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ergy-chart-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ring-Ridge-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…horizontal-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…mbiosis-11-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ses2good-3-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…olar-inset-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Townhomes-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ons-Hope-6-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…E-extras-5-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ts-Manager-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…lBourdier4-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…olarShare1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…h-shovel-1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…enhanced-1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…en-at-AEEA-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Wind-Farm-CROPPED.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ie-on-roof-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-unit-WIDE-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-students-300x300.jpeg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Version-2-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ab-behind-300x300.jpeg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ll-Creek-1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…f-Canada-1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…sive-House-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ftop-solar-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…red-Simons-300x300.png (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…7B7AEE7DC-300x300.jpeg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ture-Image-300x300.png (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…el-machine-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Wallraven-300x300.png (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…UARE-IMAGE-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…athan-banks-main-1.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…rek-Leahy4-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…th-office1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…g-in-field-300x300.png (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…aic-Centre-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Tesla-Blue-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…Chevy-Bolt-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-on-roof-1-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…an-Leaf-20-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…l-X-square-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…t-3-square-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…iel-LowRes-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…-Recycling-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ng_People_Marching.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-content/upload…ight_final-300x300.jpg (4 hours)
http://www.greenenergyfutures.ca/wp-includes/css/d…-library/style.min.css (4 hours)
http://www.greenenergyfutures.ca/wp-includes/js/jq…/jquery-migrate.min.js (4 hours)
http://www.greenenergyfutures.ca/wp-includes/js/jquery/jquery.js (4 hours)
http://www.greenenergyfutures.ca/wp-includes/js/wp-emoji-release.min.js (4 hours)
priority - 156 Optimize images
Properly formatting and compressing images can save many bytes of data.
Optimize the following images to reduce their size by 1.5MiB (95% reduction).
Compressing and resizing http://www.greenenergyfutures.ca/wp-content/upload…ng_People_Marching.jpg could save 80.8KiB (96% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/themes…/images/GEF-header.jpg could save 31.7KiB (52% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/upload…athan-banks-main-1.jpg could save 19.6KiB (42% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/upload…-powerwall-300x300.jpg could save 824B (16% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/upload…-RE-Myths1-150x150.jpg could save 453B (16% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/upload…-Turbines2-150x150.jpg could save 442B (20% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/upload…ind-Myths1-150x150.jpg could save 413B (14% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/upload…5/SK-Wind1-150x150.jpg could save 383B (11% reduction).
priority - 104 Enable compression
Compressing resources with gzip or deflate can reduce the number of bytes sent over the network.
Enable compression for the following resources to reduce their transfer size by 1,016.3KiB (84% reduction).
Compressing http://www.greenenergyfutures.ca/wp-includes/js/jquery/jquery.js could save 61.6KiB (65% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/plugins/jetpack/css/jetpack.css could save 57.7KiB (82% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/plugin…sets/css/style.min.css could save 41.3KiB (86% reduction).
Compressing http://www.greenenergyfutures.ca/wp-includes/css/d…-library/style.min.css could save 24KiB (83% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/themes…/library/css/style.css could save 20.1KiB (72% reduction).
Compressing http://www.greenenergyfutures.ca/wp-includes/js/wp-emoji-release.min.js could save 9KiB (66% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/themes…odernizr.custom.min.js could save 8.7KiB (58% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/plugin…ets/js/frontend.min.js could save 6.4KiB (70% reduction).
Compressing http://www.greenenergyfutures.ca/wp-includes/js/jq…/jquery-migrate.min.js could save 5.9KiB (60% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/plugin…blocks.style.build.css could save 1.4KiB (67% reduction).
Compressing http://www.greenenergyfutures.ca/wp-content/plugin…/css/rss-retriever.css could save 931B (64% reduction).
priority - 66 Reduce server response time
In our test, your server responded in 2.2 seconds.
There are many factors that can slow down your server response time. Please read our recommendations to learn how you can monitor and measure where your server is spending the most time.
priority - 32 Eliminate render-blocking JavaScript and CSS in above-the-fold content
Your page has 4 blocking script resources and 8 blocking CSS resources. This causes a delay in rendering your page.
None of the above-the-fold content on your page could be rendered without waiting for the following resources to load. Try to defer or asynchronously load blocking resources, or inline the critical portions of those resources directly in the HTML.
Remove render-blocking JavaScript:
http://www.greenenergyfutures.ca/wp-includes/js/jquery/jquery.js
http://www.greenenergyfutures.ca/wp-includes/js/jq…/jquery-migrate.min.js
http://www.greenenergyfutures.ca/wp-content/themes…odernizr.custom.min.js
Optimize CSS Delivery of the following:
http://www.greenenergyfutures.ca/wp-includes/css/d…-library/style.min.css
http://maxcdn.bootstrapcdn.com/font-awesome/4.7.0/css/font-awesome.min.css
http://www.greenenergyfutures.ca/wp-content/plugin…/css/rss-retriever.css
http://www.greenenergyfutures.ca/wp-content/plugin…sets/css/style.min.css
http://www.greenenergyfutures.ca/wp-content/themes…/library/css/style.css
http://www.greenenergyfutures.ca/wp-content/plugins/jetpack/css/jetpack.css
http://cdn-images.mailchimp.com/embedcode/classic-081711.css
priority - 15 Minify HTML
Compacting HTML code, including any inline JavaScript and CSS contained in it, can save many bytes of data and speed up download and parse times.
Minify HTML for the following resources to reduce their size by 149.4KiB (17% reduction).
priority - 0 Minify CSS
Compacting CSS code can save many bytes of data and speed up download and parse times.
Minify CSS for the following resources to reduce their size by 358B (14% reduction).
Minifying http://cdn-images.mailchimp.com/embedcode/classic-081711.css could save 140B (13% reduction) after compression.
greenenergyfutures.ca Mobile Resources
Total Resources | 238 |
Number of Hosts | 6 |
Static Resources | 236 |
JavaScript Resources | 7 |
CSS Resources | 8 |
greenenergyfutures.ca Mobile Resource Breakdown
greenenergyfutures.ca mobile page usability
Last tested: 2019-10-14
greenenergyfutures.ca Mobile Usability Test Quick Summary
priority - 0 Size tap targets appropriately
Some of the links/buttons on your webpage may be too small for a user to easily tap on a touchscreen. Consider making these tap targets larger to provide a better user experience.
The following tap targets are close to other nearby tap targets and may need additional spacing around them.
<a href="http://www.gre…s.ca/subscribe" class="subscribe-butt…nate-subscribe">Subscribe</a>
and 2 others are close to other tap targets.The tap target
<a href="http://www.gre…ed-to-net-zero">231. How a bru…ed to Net-Zero</a>
and 10 others are close to other tap targets.The tap target
<a href="http://feeds.s…813/sounds.rss"></a>
and 2 others are close to other tap targets.greenenergyfutures.ca similar domains
www.greenenergyfutures.net
www.greenenergyfutures.org
www.greenenergyfutures.info
www.greenenergyfutures.biz
www.greenenergyfutures.us
www.greenenergyfutures.mobi
www.reenenergyfutures.ca
www.greenenergyfutures.ca
www.freenenergyfutures.ca
www.gfreenenergyfutures.ca
www.fgreenenergyfutures.ca
www.vreenenergyfutures.ca
www.gvreenenergyfutures.ca
www.vgreenenergyfutures.ca
www.treenenergyfutures.ca
www.gtreenenergyfutures.ca
www.tgreenenergyfutures.ca
www.breenenergyfutures.ca
www.gbreenenergyfutures.ca
www.bgreenenergyfutures.ca
www.yreenenergyfutures.ca
www.gyreenenergyfutures.ca
www.ygreenenergyfutures.ca
www.hreenenergyfutures.ca
www.ghreenenergyfutures.ca
www.hgreenenergyfutures.ca
www.geenenergyfutures.ca
www.geeenenergyfutures.ca
www.greeenenergyfutures.ca
www.gereenenergyfutures.ca
www.gdeenenergyfutures.ca
www.grdeenenergyfutures.ca
www.gdreenenergyfutures.ca
www.gfeenenergyfutures.ca
www.grfeenenergyfutures.ca
www.gteenenergyfutures.ca
www.grteenenergyfutures.ca
www.grenenergyfutures.ca
www.grwenenergyfutures.ca
www.grewenenergyfutures.ca
www.grweenenergyfutures.ca
www.grsenenergyfutures.ca
www.gresenenergyfutures.ca
www.grseenenergyfutures.ca
www.grdenenergyfutures.ca
www.gredenenergyfutures.ca
www.grrenenergyfutures.ca
www.grerenenergyfutures.ca
www.grreenenergyfutures.ca
www.grewnenergyfutures.ca
www.greewnenergyfutures.ca
www.gresnenergyfutures.ca
www.greesnenergyfutures.ca
www.grednenergyfutures.ca
www.greednenergyfutures.ca
www.grernenergyfutures.ca
www.greernenergyfutures.ca
www.greeenergyfutures.ca
www.greebenergyfutures.ca
www.greenbenergyfutures.ca
www.greebnenergyfutures.ca
www.greehenergyfutures.ca
www.greenhenergyfutures.ca
www.greehnenergyfutures.ca
www.greejenergyfutures.ca
www.greenjenergyfutures.ca
www.greejnenergyfutures.ca
www.greemenergyfutures.ca
www.greenmenergyfutures.ca
www.greemnenergyfutures.ca
www.greennergyfutures.ca
www.greenwnergyfutures.ca
www.greenewnergyfutures.ca
www.greenwenergyfutures.ca
www.greensnergyfutures.ca
www.greenesnergyfutures.ca
www.greensenergyfutures.ca
www.greendnergyfutures.ca
www.greenednergyfutures.ca
www.greendenergyfutures.ca
www.greenrnergyfutures.ca
www.greenernergyfutures.ca
www.greenrenergyfutures.ca
www.greeneergyfutures.ca
www.greenebergyfutures.ca
www.greenenbergyfutures.ca
www.greenebnergyfutures.ca
www.greenehergyfutures.ca
www.greenenhergyfutures.ca
www.greenehnergyfutures.ca
www.greenejergyfutures.ca
www.greenenjergyfutures.ca
www.greenejnergyfutures.ca
www.greenemergyfutures.ca
www.greenenmergyfutures.ca
www.greenemnergyfutures.ca
www.greenenrgyfutures.ca
www.greenenwrgyfutures.ca
www.greenenewrgyfutures.ca
www.greenenwergyfutures.ca
www.greenensrgyfutures.ca
www.greenenesrgyfutures.ca
www.greenensergyfutures.ca
www.greenendrgyfutures.ca
www.greenenedrgyfutures.ca
www.greenendergyfutures.ca
www.greenenrrgyfutures.ca
www.greenenerrgyfutures.ca
www.greenenrergyfutures.ca
www.greenenegyfutures.ca
www.greeneneegyfutures.ca
www.greeneneregyfutures.ca
www.greeneneergyfutures.ca
www.greenenedgyfutures.ca
www.greenenerdgyfutures.ca
www.greenenefgyfutures.ca
www.greenenerfgyfutures.ca
www.greenenefrgyfutures.ca
www.greenenetgyfutures.ca
www.greenenertgyfutures.ca
www.greenenetrgyfutures.ca
www.greeneneryfutures.ca
www.greenenerfyfutures.ca
www.greenenergfyfutures.ca
www.greenenervyfutures.ca
www.greenenergvyfutures.ca
www.greenenervgyfutures.ca
www.greenenertyfutures.ca
www.greenenergtyfutures.ca
www.greenenerbyfutures.ca
www.greenenergbyfutures.ca
www.greenenerbgyfutures.ca
www.greeneneryyfutures.ca
www.greenenergyyfutures.ca
www.greenenerygyfutures.ca
www.greenenerhyfutures.ca
www.greenenerghyfutures.ca
www.greenenerhgyfutures.ca
www.greenenergfutures.ca
www.greenenergtfutures.ca
www.greenenergytfutures.ca
www.greenenerggfutures.ca
www.greenenergygfutures.ca
www.greenenerggyfutures.ca
www.greenenerghfutures.ca
www.greenenergyhfutures.ca
www.greenenergufutures.ca
www.greenenergyufutures.ca
www.greenenerguyfutures.ca
www.greenenergyutures.ca
www.greenenergycutures.ca
www.greenenergyfcutures.ca
www.greenenergycfutures.ca
www.greenenergydutures.ca
www.greenenergyfdutures.ca
www.greenenergydfutures.ca
www.greenenergyrutures.ca
www.greenenergyfrutures.ca
www.greenenergyrfutures.ca
www.greenenergytutures.ca
www.greenenergyftutures.ca
www.greenenergygutures.ca
www.greenenergyfgutures.ca
www.greenenergyvutures.ca
www.greenenergyfvutures.ca
www.greenenergyvfutures.ca
www.greenenergyftures.ca
www.greenenergyfytures.ca
www.greenenergyfuytures.ca
www.greenenergyfyutures.ca
www.greenenergyfhtures.ca
www.greenenergyfuhtures.ca
www.greenenergyfhutures.ca
www.greenenergyfjtures.ca
www.greenenergyfujtures.ca
www.greenenergyfjutures.ca
www.greenenergyfitures.ca
www.greenenergyfuitures.ca
www.greenenergyfiutures.ca
www.greenenergyfuures.ca
www.greenenergyfurures.ca
www.greenenergyfutrures.ca
www.greenenergyfurtures.ca
www.greenenergyfufures.ca
www.greenenergyfutfures.ca
www.greenenergyfuftures.ca
www.greenenergyfugures.ca
www.greenenergyfutgures.ca
www.greenenergyfugtures.ca
www.greenenergyfuyures.ca
www.greenenergyfutyures.ca
www.greenenergyfutres.ca
www.greenenergyfutyres.ca
www.greenenergyfutuyres.ca
www.greenenergyfuthres.ca
www.greenenergyfutuhres.ca
www.greenenergyfuthures.ca
www.greenenergyfutjres.ca
www.greenenergyfutujres.ca
www.greenenergyfutjures.ca
www.greenenergyfutires.ca
www.greenenergyfutuires.ca
www.greenenergyfutiures.ca
www.greenenergyfutues.ca
www.greenenergyfutuees.ca
www.greenenergyfuturees.ca
www.greenenergyfutueres.ca
www.greenenergyfutudes.ca
www.greenenergyfuturdes.ca
www.greenenergyfutudres.ca
www.greenenergyfutufes.ca
www.greenenergyfuturfes.ca
www.greenenergyfutufres.ca
www.greenenergyfututes.ca
www.greenenergyfuturtes.ca
www.greenenergyfututres.ca
www.greenenergyfuturs.ca
www.greenenergyfuturws.ca
www.greenenergyfuturews.ca
www.greenenergyfuturwes.ca
www.greenenergyfuturss.ca
www.greenenergyfuturess.ca
www.greenenergyfuturses.ca
www.greenenergyfuturds.ca
www.greenenergyfutureds.ca
www.greenenergyfuturrs.ca
www.greenenergyfuturers.ca
www.greenenergyfuturres.ca
www.greenenergyfuture.ca
www.greenenergyfuturew.ca
www.greenenergyfuturesw.ca
www.greenenergyfuturee.ca
www.greenenergyfuturese.ca
www.greenenergyfutured.ca
www.greenenergyfuturesd.ca
www.greenenergyfuturez.ca
www.greenenergyfuturesz.ca
www.greenenergyfuturezs.ca
www.greenenergyfuturex.ca
www.greenenergyfuturesx.ca
www.greenenergyfuturexs.ca
www.greenenergyfuturea.ca
www.greenenergyfuturesa.ca
www.greenenergyfutureas.ca
greenenergyfutures.ca Ping
Ping is a networking utility tool to test if a particular host is reachable. It is a diagnostic that checks reachability of a host on an Internet Protocol (IP) network. In a computer network, a ping test is a way of sending messages from one host to another. Aside from checking if the host is connected to a network, ping also gives indicators of the reliability and general speed of the connection.
greenenergyfutures.ca TRACEROUTE
Traceroute is a network diagnostic tool used to track the pathway taken by a packet on an IP network from source to destination. Traceroute also records the time taken for each hop the packet makes during its route to the destination. Traceroute uses ICMP (Internet Control Message Protocol) echo packets with variable time to live values. The response time of each hop is calculated. To guarantee accuracy, each hop is queried multiple times (usually three times) to better measure the response of that particular hop.